Motec LTCD Dual Lambda to CAN Module Long Lead PN:61301L

515.00

Available on backorder

MoTeC’s LTC (Lambda to CAN) modules monitor, control and diagnose Bosch LSU 4.9 Lambda sensors, transmitting readings on a CAN bus. When multiple LTCs are used, up to 32 Lambda sensors can be configured on a single CAN bus, allowing a CAN-enabled ECU or logging device to simultaneously monitor numerous Lambda sensors. The LTC is also available as a dual version LTCD to work with two sensors into one module. Sensor sold separately.

515.00

Description

MoTeC’s LTC (Lambda to CAN) modules monitor, control and diagnose Bosch LSU 4.9 Lambda sensors

Check Full MoTeC Pricelist (download pdf, 9,3 MB)
Click on the picture below:

Main Menu

Motec LTCD Dual Lambda to CAN Module Long Lead PN:61301L

515.00

Add to Cart